Go to spec numbering scheme page
Click on collapse (-) to show Feature level tasks only.
Click on UID to show list of all TSs & TRs associated with this work item.
Click on WI code to see a list of TSs and TRs specifically resulting from this work item.
Click on the percentage completion to see a list of approved Change Requests associated with this work item.
Following the remarks column, the fields show whether the WI is approved at TSG level or at WG level, which TSG it was approved at, and if it is a candidate for "early implementation" (EI).
The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.
Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.
| Key to colours used on time line: | |
| portion of task already accomplished: | ================== |
| portion of task not yet accomplished, behind schedule: | ------------------ |
| "Now" - date on which snapshot was taken: | | |
| portion of task not yet accomplished, future: | ------------------ |
| The darker the colour, the higher the heirarchical level of the task. |
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| FS_RSE | Study on RAN Sharing Enhancements | ===============|==- | Rel-13 | S1 | SP-110820 | history | 2013-03-06 | SP#59 completion 03/13=>06/13 (moved to Rel-13). Extend Rel-6 Network Sharing UID_31018 (basic scenarios of network/RAN sharing) to cover more complex scenarios that arise due to recent needs for more dynamic co-operation among operators | 2011-11-29 | 22.852 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| FS_ACDC | Study on Application specific Congestion control for Data Communication | ====--|--------- | Rel-13 | S1 | SP-120546 | history | 2013-03-06 | SP#59 completion 06/13=>12/13 (moved to Rel-13). ACDC is applicable to UTRAN and E-UTRAN. SP#59 pin-off Normative work ASAC | 2012-08-31 | 22.806 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| FS_UMONC | Study on Usage Monitoring Control enhancement | =====================|============--------- | Rel-13 | S2;S1 | SP-120554 | history | 2013-03-06 | SP#59 normative Stage 2 completed; Hence, this Study FS_UMONC is on hold and moved to Rel-13 | 2011-05-19 | 23.858 | |||||
|
- | ...SA1 part of Study on Usage Monitoring Control enhancement | ============ | | Rel-13 | S1 | SP-120554 | history | 2012-08-30 | SP#56 completed | 2011-05-19 | 23.858 | ||||
|
- | ...SA2 part of Study on Usage Monitoring Control enhancement | =====================|========------------- | Rel-13 | S2 | SP-120554 | history | 2013-02-27 | SP#59 normative Stage 2 completed; Hence, this Study FS_UMONC is on hold and moved to Rel-13 | 2011-05-19 | 23.858 | ||||
|
- | ...Deleted - SA5 part of Study on Usage Monitoring Control enhancement | ====== | | Rel-13 | S5 | SP-120554 | history | 2012-08-30 | SP#57 stopped | 2011-05-19 | 32.858 | PCG-29 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SIPTO_SC | SIPTO Service Continuity of IP Data Session | ============ | | Rel-12 | S1 | SP-100589 | history | 2012-08-30 | SP#57 moved to Rel-12 (Reason: Stage 2 for requirements in TS 22.101 clause 4.3.5 have not been implemented in Rel-11). Linked to Rel-10 Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) | 2010-09-01 | Stage 1 | |||||
|
- | ...Stage 1 for SIPTO Service Continuity of IP Data Session | ============ | | Rel-12 | S1[99%] | SP-100589 | history | 2012-08-30 | SP#57 moved to Rel-12. SP#53 completed | 2010-09-01 | 22.101, 22.220 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| MOSAP | Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers | ======================== | | Rel-12 | S1;S2 | SP-120427 | history | 2012-11-22 | SP#58 Stage 2 stopped (TR only, no normative work done) | 2010-11-29 | Stage 1 | |||||
|
- | ...Stage 1 for MOSAP | ========= | | Rel-12 | S1[99%] | SP-120427 | history | 2012-06-09 | SP#53 completed | 2010-11-29 | 22.278 | ||||
|
- | ...TR on Stage 2 for MOSAP | ================== | | Rel-12 | S2 | SP-120427 | history | 2012-11-22 | SP#58 completed. TR 23.862 v100 for Information (no further work needed) | 2011-05-26 | new TR 23.862 | ||||
|
- | ...Deleted - Stage 2 for MOSAP | ================== | | Rel-12 | S2 | SP-120427 | history | 2012-11-22 | SP#58 stopped (no normative work done) | 2011-05-26 | TBD | PCG-30 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| INIPUI | IMS Network-Independent Public User Identities | ============ | | Rel-12 | S1 | SP-120425 | history | 2012-06-19 | Triggered by Rel-11 TR 22.894 (FS_INIPUI) | 2011-05-19 | Stage 1 | |||||
|
- | ...Stage 1 for IMS Network-Independent Public User Identities | ============ | | Rel-12 | S1 | SP-120425 | history | 2012-06-19 | SP#56 re-completed. Updated WID SP-110381=>SP-120425 (Re-opened & moved to Rel-12 by adding new reqs & removing reqs from Rel-11). SP#53 Rel-11 Stage 1 completed | 2011-05-19 | 22.115, 22.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SMURFs | Service and Media Reachability for Users over Restrictive Firewalls | ========= | | Rel-12 | S1 | SP-110653 | history | 2011-09-15 | SP#56 Stage 1 completed | 2011-07-19 | Stage 1 | |||||
|
- | ...Stage 1 for Service and Media Reachability for Users over Restrictive Firewalls | ========= | | Rel-12 | S1 | SP-110653 | history | 2012-06-08 | SP#56 completed | 2011-07-19 | 22.278 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IPXSNAT | Advanced IP Interconnection of Services (IPXS) for national interconnect | ====== | | Rel-12 | S1 | SP-120428 | history | 2012-08-07 | SP#57 Stage 1 completed. Linked to Rel-11 Feature Advanced IP Interconnection of Services (IPXS) UID_470051. | 2012-02-22 | Stage 1 | |||||
|
- | ...Stage 1 for Advanced IP Interconnection of Services (IPXS) for national interconnect | ====== | | Rel-12 | S1[99%] | SP-120428 | history | 2013-01-14 | SP#57 completed | 2012-02-22 | 22.228 CR#0161 (IMS interconnect with non-IMS based SIP networks) | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SSO_Int | Integration of Single Sign-On (SSO) frameworks with 3GPP networks | ====== | | Rel-12 | S1 | SP-120184 | history | 2012-08-07 | SP#57 Stage 1 completed. Triggered by Rel-12 TR 22.895. Linked to SA3 33.8xy (Study on Security aspects of SSO_Int), 33.914 (SSO application security for common IMS based on SIP Digest), 33.924 (i/w GBA and OpenID), 33.980 (i/w GBA and Liberty Alliance) | 2012-02-22 | Stage 1 | |||||
|
- | ...Stage 1 for Integration of Single Sign-On (SSO) frameworks with 3GPP networks | ====== | | Rel-12 | S1[99%] | SP-120184 | history | 2012-08-07 | SP#57 completed | 2012-02-22 | 22.101 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ECTB | Explicit Communication Transfer Blind (ECT Blind) service interactions | | | Rel-12 | S1 | SP-120301 | history | 2012-06-08 | SP#56 WID approved & Stage 1 completed | 2012-05-14 | Stage 1 | |||||
|
- | ...Stage 1 for Explicit Communication Transfer Blind (ECT Blind) service interactions | | | Rel-12 | S1 | SP-120301 | history | 2012-06-08 | SP#56 new WID approved & work completed. Clarify the service interactions between ECT Blind and other MMTEL Supplementary Services | 2012-05-14 | 22.173 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMSSat | IMS access via Digital Video Broadcast - Return Channel via Satellite (DVB-RCS2) | ======= | | Rel-12 | S1 | SP-120543 | history | 2012-08-08 | SP#57 Stage 1 completed. Integrate Satcom access with IMS. Specify DVB-RCS2 as an IP Connectivity Access Network for IMS | 2012-08-06 | Stage 1 | |||||
|
- | ...Stage 1 for IMS access via DVB-RCS2 | ======= | | Rel-12 | S1[99%] | SP-120543 | history | 2012-08-08 | SP#57 completed. Definition of DVB-RCS2 as a non-3GPP IP Connectivity Access Network for IMS | 2012-08-06 | 22.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SEQ_FA | Sequential Flexible Alerting | | | Rel-12 | S1 | SP-120895 | history | 2012-11-21 | SP#58 approved WID & Stage 1 completed. Currently Flexible Alerting (FA) group members are simultaneously alerted by the incoming call. Add the possibility to alert FA group members sequentially. | 2012-11-16 | Stage 1 | |||||
|
- | ...Stage 1 for Sequential Flexible Alerting | | | Rel-12 | S1 | SP-120895 | history | 2012-11-21 | SP#58 approved WID & Stage 1 completed | 2012-11-16 | 22.173 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LangInfo | Language and Modality Information for communications | ===| | Rel-12 | S1 | SP-130108 | history | 2013-02-19 | SP#59 Stage 1 completed. Triggered by Rel-11 Study on Non Voice Emergency Services (FS_NOVES) TR 22.871 use case 10 | 2012-11-16 | Stage 1 | |||||
|
- | ...Stage 1 for Language and Modality Information for communications | ===| | Rel-12 | S1 | SP-130108 | history | 2013-02-19 | SP#59 completed. Updated WID SP-120937=>SP-130108 | 2012-11-16 | 22.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_WebRTC | Web Real Time Communication access to IMS | ---|--- | Rel-12 | S1 | SP-120892 | history | 2013-02-20 | IETF RTCWEB and W3C WEBRTC groups are specifying a browser-based client to support communication services. Interoperability for WebRTC clients to access 3GPP IMS is needed. | 2012-11-16 | Stage 1 | |||||
|
- | ...Stage 1 for Web Real Time Communication access to IMS | ---|--- | Rel-12 | S1 | SP-120892 | history | 2013-02-20 | SP#59 completion 03/13=>06/13 (Exception in SP-130117) | 2012-11-16 | 22.101, 22.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ESID | Emergency Session Identification | | | Rel-12 | S1 | SP-130126 | history | 2013-02-19 | SP#59 Stage 1 completed. | 2013-02-19 | Stage 1 | |||||
|
- | ...Stage 1 for Emergency Session Identification | | | Rel-12 | S1 | SP-130126 | history | 2013-02-19 | SP#59 completed (22.101 CR#0445) | 2013-02-19 | 22.101 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ASAC | Application and Service Access Control | |--- | Rel-12 | S1 | SP-130124 | history | 2013-02-19 | SP#59 Exception in SP-130125. Triggered by TR 22.806 Study on Application specific Congestion control for Data Communication (FS_ACDC) UID_570034 | 2013-02-19 | Stage 1 | |||||
|
- | ...Stage 1 for Application and Service Access Control | |--- | Rel-12 | S1 | SP-130124 | history | 2013-02-19 | SP#59 Exception in SP-130125. Allow/prohibit for E-UTRAN idle mode UE initiation of particular applications defined by operator and subject to regional regulations. Prevent/mitigate overload of AN/CN defined by operator (congestion or disaster) | 2013-02-19 | 22.011 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| PMOC | Prevention of Mobile-Originating signalling and/or data traffic of UE in Connected mode | | | Rel-12 | S1 | SP-130111 | history | 2013-02-19 | SP#59 Stage 1 completed | 2013-02-19 | Stage 1 | |||||
|
- | ...Stage 1 for Prevention of Mobile-Originating signalling and/or data traffic of UE in Connected mode | | | Rel-12 | S1 | SP-130111 | history | 2013-02-19 | SP#59 completed | 2013-02-19 | 22.011 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_TELEP | IMS-based Telepresence | ======------------|------------ | Rel-12 | S1;C1;C3 | SP-110588 | history | 2012-06-08 | SP#56 Stage 1 completed. This feature does not introduce any changes to the IMS architecture, and no stage 2 impacts are identified | 2011-07-19 | Stage 1&3 | |||||
|
- | ...Stage 1 for IMS-based Telepresence | ========= | | Rel-12 | S1 | SP-110588 | history | 2012-06-08 | SP#56 completed | 2011-07-19 | 22.228 | ||||
|
- | ...Stage 3 for IMS Telepresence | ---|------------ | Rel-12 | C1;C3 | CP-120906 | history | 2012-12-06 | - | 2012-11-19 | Stage 3 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| GCSE_LTE | Group Communication System Enablers for LTE | ===------|--------- | Rel-12 | S1;S2 | SP-130158 | history | 2013-03-04 | Linked to Rel-12 FS_ProSe TR 22.803 Study on Proximity-based Services. External requirements: NIST, MESA, APCO Global Alliance, TCCA. Specify 3GPP system enablers to support group communication over LTE for Public Safety | 2012-05-14 | Stage 1/2 | |||||
|
- | ...Stage 1 for Group Communication System Enablers for LTE | ======---|--- | Rel-12 | S1 | SP-130158 | history | 2013-03-04 | SA#59 completion 03/13=>06/13 (Exception in SP-130114) | 2012-05-14 | new TS 22.468 | ||||
|
- | ...TR on Architecture Enhancements to Support Group Communication System Enablers for LTE | |--------- | Rel-12 | S2 | SP-130158 | history | 2013-03-04 | SP#59 updated WID SP-120876=>SP-130158 (added SA2 part) | 2013-02-21 | new TR 23.8xy | ||||
|
- | ...Stage 2 for Group Communication System Enablers for LTE | |--------- | Rel-12 | S2 | SP-130158 | history | 2013-03-04 | SP#59 updated WID SP-120876=>SP-130158 (added SA2 part) | 2013-02-21 | TBD | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_RegCon | IMS Registration Control | ===========---|--- | Rel-12 | S1;S2 | SP-120735 | history | 2013-02-27 | Specify for fixed line the requirement of controlling user registration to IMS based on network information related to user location (e.g. IP address, DSLAM information) | 2012-08-06 | Stage 1/2 | |||||
|
- | ...Stage 1 for IMS Registration Control | ======== | | Rel-12 | S1[99%] | SP-120735 | history | 2012-08-30 | SP#57 completed | 2012-08-06 | 22.228 | ||||
|
- | ...Stage 2 for IMS Registration Control | =--|--- | Rel-12 | S2 | SP-120735 | history | 2013-02-27 | - | 2012-11-13 | 23.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| UPCON | User Plane Congestion management | =========----|------ | Rel-12 | S1;S2 | SP-120890 | history | 2012-12-11 | Triggered by Rel-12 TR 22.805 Study on User Plane Congestion management (FS_UPCON) | 2012-08-06 | Stage 1/2 | |||||
|
- | ...Stage 1 for User Plane Congestion management | =============| | Rel-12 | S1 | SP-120890 | history | 2013-02-19 | SP#59 completed. Convert TR 22.805 clause 6 consolidated requirements to normative requirements in 22.101 | 2012-08-06 | 22.101 | ||||
|
- | ...TR on Stage 2 for User Plane Congestion management | =--|------ | Rel-12 | S2 | SP-120890 | history | 2013-02-27 | - | 2012-11-13 | new TR 23.705 | ||||
|
- | ...Stage 2 for User Plane Congestion management | ---|------ | Rel-12 | S2 | SP-120890 | history | 2013-02-27 | - | 2012-11-13 | TBD | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LIMONET | LIPA Mobility and SIPTO at the Local Network | =========================----|------------ | Rel-12 | S2;C4;C1;R3 | SP-120926 | history | 2013-02-27 | SP#58 updated WID SP-120256=>SP-120926 (stopped BB2 LIMONET-LIPA on Mobility). Linked to UID_450035 Local IP Access and Selected IP Traffic Offload (LIPA_SIPTO) | 2010-11-26 | Stage 2/3 | |||||
|
- | ...TR on Stage 2 for LIPA Mobility and SIPTO at the Local Network | =============================| | Rel-12 | S2 | SP-120926 | history | 2013-02-27 | SP#59 completed. TR 23.859 v100 for Information and Approval | 2010-11-26 | new TR 23.859 | ||||
|
LIMONET-SIPTO | ...BB1: Stage 2 for SIPTO at the Local Network | =============================|=-- | Rel-12 | S2 | SP-120926 | history | 2013-02-27 | SP#59 completion 03/13=>06/13 | 2010-11-26 | 23.060, 23.401 | ||||
|
- | ...BB1: Stage 3 CN aspects of SIPTO at the Local Network | ------------------|--------- | Rel-12 | C4;C1 | CP-110801 | history | 2012-06-06 | - | 2011-08-27 | Stage 3 | ||||
|
LIMONET-RAN | ...RAN aspects for SIPTO at the Local Network | |------------ | Rel-12 | R3 | RP-130372 | history | 2013-02-26 | - | 2013-02-26 | UTRA, LTE | ||||
|
LIMONET-LIPA | ...Deleted - BB2: Stage 2 for stand-alone L-GW and associated Mobility for LIPA and SIPTO at the Local Network | ========================== | | Rel-12 | S2 | SP-120926 | history | 2013-02-27 | SP#58 updated WID SP-120256=>SP-120926 (stopped BB2 LIMONET-LIPA on Mobility) | 2010-11-26 | 23.060, 23.401 | PCG-30 | |||
|
- | ...Deleted - BB2: Stage 3 CN aspects of LIPA Mobility | =============== | | Rel-12 | C1;C4 | CP-110820 | history | 2012-06-06 | SP#58 CT Stage 3 part stopped because of SA stopping Stage 2 for BB2 LIMONET-LIPA on Mobility) | 2011-08-27 | Stage 3 | PCG-30 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| OPIIS | Operator Policies for IP Interface Selection | ========================| | Rel-12 | S2 | SP-120738 | history | 2013-02-27 | SP#59 Stage 2 completed. Linked to Rel-10 IFOM IP Flow Mobility and seamless WLAN offload (non-seamless WLAN offload aspects) & Rel-11 LIMONET (support traffic offload at local network) | 2011-02-21 | Stage 2 | |||||
|
- | ...TR on Stage 2 for Operator Policies for IP Interface Selection | ===================== | | Rel-12 | S2 | SP-120738 | history | 2012-12-10 | SP#58 completed | 2011-02-21 | new TR 23.853 | ||||
|
- | ...Stage 2 for Operator Policies for IP Interface Selection | =======================| | Rel-12 | S2 | SP-120738 | history | 2013-02-27 | SP#59 completed (23.402 CR#152: Introduction of Inter-APN Routing Policies) | 2011-02-21 | 23.402 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SMSMI | Short Message Service (SMS) submit and delivery without MSISDN in IMS | ====================-|------ | Rel-12 | S2;C1;C4 | SP-120321 | history | 2012-06-09 | SP#58 completed. Linked to Rel-7 SMSIP (Support of SMS over generic 3GPP IP access), Rel-11 SIMTC, Rel-12 TR 22.988 SA1 Study on alternatives to E.164 for MTC | 2011-05-26 | Stage 2/3 | |||||
|
- | ...TR on Stage 2 for SMS submit and delivery without MSISDN in IMS | ================== | | Rel-12 | S2[99%] | SP-120321 | history | 2012-11-22 | SP#58 completed | 2011-05-26 | new TR 23.863 | ||||
|
- | ...Stage 2 for SMS submit and delivery without MSISDN in IMS | ================== | | Rel-12 | S2 | SP-120321 | history | 2012-06-09 | SP#58 completed | 2011-05-26 | 23.204, 23.682 | ||||
|
SMSMI-CT | ...Stage 3 for SMS submit and delivery without MSISDN in IMS | |------ | Rel-12 | C1;C4 | CP-130090 | history | 2013-02-28 | Address scenario IMS client to IMS client SMS (comprises SMS receive and send SMS without requiring an MSISDN associated as part of their subscription record in HSS | 2013-02-16 | Stage 3 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| MTCe | Machine-Type and other mobile data applications Communications enhancements | ========================---------------|--------- | Rel-12 | S2;S1;S3 | SP-120540 | history | 2013-01-08 | SP#58 stopped BB2 and BB4. Split BB1 and BB3 into TR and Stage 2 work. | 2012-04-13 | Stage 1/2 | |||||
|
MTCe-SIMSE | ...Stage 1 for Support for Interworking with M2M Service Enablement | =========| | Rel-12 | S1 | SP-120436 | history | 2013-02-19 | SP#59 completed. Define requirements for interworking with M2M service enablement layer specified by ETSI TC M2M in TS 102 689 (Source of specifications for Service Enablement layer) | 2012-05-14 | 22.368 | ||||
|
MTCe-SRM | ...Stage 1 for Machine-Type and other mobile data applications Communications – Service Requirement Maintenance | ======| | Rel-12 | S1 | SP-130105 | history | 2013-02-19 | SP#59 completed. Updated WID SP-120541=>SP-130105 | 2012-08-06 | 22.101, 22.368 | ||||
|
MTCe-SDDTE | ...BB1: Small Data and Device Triggering Enhancements (SDDTE) | ====-----|------ | Rel-12 | S2 | SP-120450 | history | 2013-01-08 | SP#58 split BB1 into TR and Stage 2 work | 2012-04-13 | - | ||||
|
MTCe-UEPCOP | ...BB3: UE Power Consumptions Optimizations (UEPCOP) | ====-----|------ | Rel-12 | S2 | SP-120442 | history | 2013-01-08 | SP#58 split BB3 into TR and Stage 2 work | 2012-04-13 | - | ||||
|
NIMTC | ...TR on Security aspects of Machine-Type Communications | =============================----------|------ | Rel-12 | S3 | SP-120540 | history | 2013-02-18 | Was Rel-10 UID_460023 (Security for NIMTC). Was Rel-11 UID_490028 (TR on Security aspects of Machine-Type Communications). SP#56 activity transferred to Rel-12 Feature MTCe | 2012-08-16 | new TR 33.868 | ||||
|
- | ...Security and Privacy aspects for Machine-Type and other mobile data applications Communications enhancements (Stage 2) | ---------|--------- | Rel-12 | S3 | SP-120540 | history | 2013-02-18 | Stage 2 | 2012-06-02 | new TS 33.xyz | ||||
|
MTCe-MONTE | ...Deleted - BB2: Monitoring Enhancements (MONTE) | ====== | | Rel-12 | S2 | SP-120438 | history | 2012-12-14 | SP#58 stopped | 2012-04-13 | 23.682 | PCG-30 | |||
|
MTCe-GROUP | ...Deleted - BB4: Group based MTC feature (GROUP) | ====== | | Rel-12 | S2 | SP-120267 | history | 2012-12-14 | SP#58 stopped | 2012-04-13 | 23.682 | PCG-30 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| P4C | Policy and Charging Control for supporting fixed broadband access networks | =========|=-------- | Rel-12 | S2;S1 | SP-120443 | history | 2013-01-08 | Linked to BBF, IETF work. SP#58 stopped BB3 to BB6. Split BB1 and BB2 into TR and Stage 2 work | 2012-04-13 | Stage 1/2 | |||||
|
P4C-FMC | ...Stage 1 for Policy and Charging Support for Fixed Mobile Convergence | | | Rel-12 | S1 | SP-120542 | history | 2013-01-08 | SP#57 completed | 2012-08-06 | 22.278 | ||||
|
P4C-F | ...BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F) | ======---|--------- | Rel-12 | S2 | SP-120275 | history | 2013-01-08 | - | 2012-06-04 | - | ||||
|
P4C-TI | ...BB2: Policy and Charging Control for 3GPP UEs connected to BroadBand Forum access network as Trusted network in Interworking scenario (P4C-TI) | ====-----|--------- | Rel-12 | S2 | SP-120444 | history | 2013-01-08 | - | 2012-06-04 | - | ||||
|
P4C-S2bc | ...Deleted - BB3: Policy and Charging Control for 3GPP UEs connected to fixed broadband access network via S2b and S2c reference points for EPC routed traffic (P4C-S2bc) | ====== | | Rel-12 | S2 | SP-120445 | history | 2013-01-08 | SP#58 stopped | 2012-06-04 | 23.139, 23.203 | PCG-30 | |||
|
P4C-HeNB | ...Deleted - BB4: Policy and Charging Control for EPC routed traffic over fixed broadband access networks of 3GPP UEs connected via H(e)NB in convergent scenarios (P4C-HeNB) | ====== | | Rel-12 | S2 | SP-120278 | history | 2013-01-08 | SP#58 stopped | 2012-06-04 | 23.139, 23.203 | PCG-30 | |||
|
P4C-FL2 | ...Deleted - BB5: Policy and Charging Control for supporting Layer 2 traffic in fixed broadband access network (P4C-FL2) | ====== | | Rel-12 | S2 | SP-120279 | history | 2013-01-08 | SP#58 stopped | 2012-06-04 | 23.139, 23.203 | PCG-30 | |||
|
P4C-TC | ...Deleted - BB6: Policy and Charging Control for 3GPP UEs connected to fixed broadband access networks via S2a reference point for EPC routed traffic in convergence (P4C-TC) | ====== | | Rel-12 | S2 | SP-120280 | history | 2013-01-08 | SP#58 stopped | 2012-06-04 | 23.139, 23.203 | PCG-30 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| BusTI | IMS Business Trunking for IP-PBX in Static Mode of Operation | ==========--------|--------- | Rel-12 | S2;S1 | SP-120862 | history | 2012-12-10 | Linked to Rel-11 IPXS Feature UID_470051 Advanced IP Interconnection of Services. This WI defines a generic framework for interconnecting with any type of IMS based network including IP-PBXs. | 2012-05-11 | Stage 1/2 | |||||
|
- | ...TR on IMS Business Trunking for IP-PBX in Static Mode of Operation | =========|--- | Rel-12 | S2;S1 | SP-120862 | history | 2013-02-27 | SP#59 completion 03/13=>06/13 | 2012-05-11 | new TR 23.897 | ||||
|
- | ...Stage 1 for IMS Business Trunking for IP-PBX in Static Mode of Operation | ============ | | Rel-12 | S1[98%] | SP-120862 | history | 2012-12-10 | SP#57 completed. 22.228CR#0171 | 2012-05-11 | 22.228 | ||||
|
- | ...Stage 2 for IMS Business Trunking for IP-PBX in Static Mode of Operation | ---------|--------- | Rel-12 | S2 | SP-120862 | history | 2013-02-27 | SP#59 completion 06/13=>12/13 | 2012-05-11 | 23.228 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| WLAN_NS | WLAN Network Selection for 3GPP Terminals | ==-------|--------- | Rel-12 | S2;S1;S3 | SP-120847 | history | 2012-12-10 | - | 2012-05-11 | Stage 1/2 | |||||
|
- | ...TR on WLAN Network Selection for 3GPP Terminals | =====----|--------- | Rel-12 | S2;S1 | SP-120847 | history | 2013-02-27 | SP#59 completion 03/13=>12/13 | 2012-05-11 | new TR 23.865 | ||||
|
- | ...Stage 2 for WLAN Network Selection for 3GPP Terminals | ---------|--------- | Rel-12 | S2 | SP-120847 | history | 2013-02-27 | SP#59 completion 03/13=>12/13 | 2012-11-22 | TBD | ||||
|
- | ...TR on Security Aspects of WLAN Network Selection for 3GPP Terminals | =--|--------- | Rel-12 | S3 | SP-120847 | history | 2013-02-18 | - | 2012-11-02 | new TR 33.8xx | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ProSe | Proximity-based Services | ==-|------------ | Rel-12 | S1;S2;S3 | SP-130030 | history | 2012-11-16 | SP#59 updated WID SP-120935=>SP-130030 (added SA3 part). Triggered by Rel-12 TR 22.803 Study on Proximity-based Services (FS_ProSe) UID_530044 | 2012-11-16 | Stage 1/2 | |||||
|
- | ...Stage 1 for Proximity-based Services | ===|==- | Rel-12 | S1 | SP-130030 | history | 2013-02-19 | SP#59 completion 03/13=>06/13 (exception in SP-130115) | 2012-11-16 | 22.115, 22.278 | ||||
|
- | ...TR on Stage 2 for Proximity-based Services | ---|------ | Rel-12 | S2 | SP-130030 | history | 2013-02-27 | - | 2012-11-16 | new TR 23.703 | ||||
|
- | ...Stage 2 for Proximity-based Services | ---|--------- | Rel-12 | S2 | SP-130030 | history | 2013-02-27 | - | 2012-11-16 | TBD | ||||
|
- | ...TR on Security for Proximity-based Services | |------------ | Rel-12 | S3 | SP-130030 | history | 2013-02-20 | SP#59 updated WID SP-120935=>SP-130030 (added SA3 part) | 2013-02-20 | new TR 33.8xy | ||||
|
- | ...Security for Proximity-based Services | |------------ | Rel-12 | S3 | SP-130030 | history | 2013-02-20 | SP#59 updated WID SP-120935=>SP-130030 (added SA3 part) | 2013-02-20 | TBD | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| UMONC | Usage Monitoring Control PCC enhancement | ===| | Rel-12 | S2 | SP-120928 | history | 2013-02-27 | SP#59 Stage 2 completed. Triggered by Rel-12 TR 23.858 Study on Usage Monitoring Control enhancement (UID_520035) | 2012-11-18 | Stage 2 | |||||
|
- | ...Stage 2 for Usage Monitoring Control PCC enhancement | ===| | Rel-12 | S2 | SP-120928 | history | 2013-02-27 | SP#59 completed. 23.203 CR#0782 (Time Based Usage Monitoring), CR#0784 (Usage Monitoring via Online Charging System) | 2012-11-18 | 23.203 (Policy and charging control architecture) | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ABC | Application Based Charging | |--------- | Rel-12 | S2 | SP-130099 | history | 2013-02-21 | Triggered by TR 23.800 Study on Application Based Charging (FS_ABC) UID_560038 | 2013-02-21 | Stage 2 | |||||
|
- | ...Stage 2 for Application Based Charging | |--------- | Rel-12 | S2 | SP-130099 | history | 2013-02-27 | - | 2013-02-21 | 23.203 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SEC12 | Rel-12 Security small Enhancements | ====================----|--------------- | Rel-12 | S3 | not applicable | history | 2013-02-18 | SEC12 is an umbrella Feature for Security related TEI12 type of changes that are not part of any other dedicated feature | 2012-06-02 | - | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| PWS_Sec | Security aspects of Public Warning System | ====================----|--------- | Rel-12 | S3;S1 | SP-120434 | history | 2012-08-07 | SP#57 Stage 1 completed | 2012-06-02 | - | |||||
|
- | ...Stage 1 for Protection against false PWS Warning Notifications | === | | Rel-12 | S1[98%] | SP-120433 | history | 2012-08-07 | SP#57 completed. Specify reqs to protect against false PWS Warning Notifications (Optional as not all regions/countries require this functionality). WID covers all objectives in SA3 PWS_Sec Feature-level WID replacing the original Stage 1 UID_510154 | 2012-06-07 | 22.268 | ||||
|
- | ...TR on SA3 part for Security aspects of Public Warning System | =======================-|--------- | Rel-12 | S3 | SP-120434 | history | 2013-02-19 | - | 2012-06-02 | new TR 33.869 | ||||
|
- | ...SA3 part for Security aspects of Public Warning System | ------------------------|--------- | Rel-12 | S3 | SP-120434 | history | 2013-02-19 | - | 2012-06-02 | new TS 33.269 | ||||
|
- | ...Deleted - Stage 1 for Security aspects of Public Warning System | =============== | | Rel-12 | S1 | SP-120434 | history | 2012-06-26 | Completed in Rel-9 under PWS. SP#55 stopped, Stage 1 requirements removed from Rel-9 onwards (SP-120172). AP 55/1: SA1 to align Stage 1 PWS security for Rel-12. SA1 new WID PWS Security UID_560029. | 2012-06-02 | 22.268 | PCG-29 | |||
|
- | ...Deleted - Stage 2 for Security aspects of Public Warning System | ====== | | Rel-12 | S2 | SP-120434 | history | 2012-02-20 | SP#53 work stopped as already done in previous releases | 2012-06-02 | 23.401 | PCG-27 | |||
|
- | ...Deleted - CT1 part for Security aspects of Public Warning System | =============== | | Rel-12 | C1 | SP-120434 | history | 2012-06-08 | TSG#56 work stopped. SP#56 updated WID SP-110223=>SP-120334 (removed all but SA3 impacted specs) | 2012-06-02 | 23.041 | PCG-29 | |||
|
- | ...Deleted - RAN2 part for Security aspects of Public Warning System | ====== | | Rel-12 | R2 | SP-120434 | history | 2012-02-20 | RP#53 work stopped as no WI in RAN | 2012-06-02 | 36.331 | PCG-27 | |||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| Web_GBA | Security enhancements for usage of Generic Bootstrapping Architecture (GBA) from the browser (Stage 2) | =====================|=-- | Rel-12 | S3 | SP-120890 | history | 2013-02-19 | SP#59 completion 03/13=>06/13 | 2011-05-17 | 33.220, 33.222, new TR 33.823 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| eMEDIASEC | Extended IMS media plane security features | ===------|--------- | Rel-12 | S3;C4;C1;C3 | SP-120447 | history | 2013-02-19 | Triggered by Rel-11 TR 33.829 Study on Extended IMS media plane security features (FS_eMEDIASEC) | 2012-06-02 | Stage 2/3 | |||||
|
- | ...SA3 part of Extended IMS media plane security features (Stage 2) | ========-| | Rel-12 | S3 | SP-120447 | history | 2013-02-19 | - | 2012-06-02 | 33.328 | ||||
|
eMEDIASEC-CT | ...CT aspects of Extended IMS media plane security features (Stage 2/3) | ---|--------- | Rel-12 | C4;C1;C3 | CP-120759 | history | 2012-11-14 | Stage 2/3 | 2012-11-14 | Stage 2/3 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LI12 | Lawful Interception in the 3GPP Rel-12 | =-----|--------- | Rel-12 | S3 | SP-130159 | history | 2013-03-05 | SP#59 update WID SP-120851=>SP-130159 | 2012-08-31 | 33.106, 33.107, 33.108 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| TURAN | Tunnelling of UE Services over Restrictive Access Networks (Stage 2/3) | ---|------ | Rel-12 | S3 | SP-120850 | history | 2013-02-20 | Linked to Rel-12 SMURFs. Related to TS 22.278 (EPS) cl.7.1.8 Service Reachability (Firewall traversal for IP based services for non-3GPP access), TS 22.228 (IMS) cl.5 (support Firewall traversal), TR 33.830 (Study on Firewall traversal) | 2012-11-12 | TBD Stage 2/3 impact existing or a new TS | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| EVS_codec | Codec for Enhanced Voice Services | ===================================-|------------------ | Rel-12 | S4;S1 | SP-100202 | history | 2010-09-01 | SP#47 Stage 1 completed. Triggered by UID_370045 Study on enhanced voice service requirements for EPS (TR 22.813) | 2010-03-10 | - | |||||
|
- | ...Stage 1 for Codec for Enhanced Voice Services | | | Rel-12 | S1 | SP-100202 | history | 2010-03-22 | SP#47 completed | 2010-03-10 | 22.173 | ||||
|
- | ...Stage 2/3 for Codec for Enhanced Voice Services | ===================================-|------------------ | Rel-12 | S4 | SP-100202 | history | 2013-02-16 | SP#58 completion 12/13=>09/14 | 2010-03-10 | 26.xyz, 26.xyz, 26.9yz | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| CVO | Coordination of Video Orientation | =========| | Rel-12 | S4[99%] | SP-120228 | history | 2013-02-16 | SP#59 completed. Resolve backward compatible video orientation mis-alignment in MTSI real-time video communication via interaction between MTSI video clients at call setup & during mid-call of the video orientation for correct local rendering | 2012-06-07 | 26.114, 26.141, 26.234, 26.346 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| HEVC | High Efficiency Video Coding | =-----|------------ | Rel-12 | S4 | SP-120510 | history | 2013-01-15 | Specify the support of HEVC in 3GPP services (PSS, DASH, MTSI, MMS, MBMS) | 2012-08-30 | - | |||||
|
- | ...TR on Evaluation of High Efficiency Video Coding for 3GPP Services | ==----|--------- | Rel-12 | S4 | SP-120510 | history | 2013-02-16 | - | 2012-08-30 | New TR 26.9xy | ||||
|
- | ...High Efficiency Video Coding in 3GPP services PSS, MBMS, DASH, MMS, MTSI | ------|------------ | Rel-12 | S4 | SP-120510 | history | 2013-02-16 | - | 2012-08-30 | 26.114, 26.140, 26.234, 26.244, 26.247, 26.346 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| M3DV_Ext | Mobile stereoscopic 3D services extensions | ===|------ | Rel-12 | S4 | SP-120768 | history | 2013-02-16 | Related to Rel-11 Study On Mobile 3D Video Coding (FS_M3DVC) TR 26.905 and Rel-11 Mobile 3D Video Coding (M3DVC) | 2012-11-12 | 26.114, 26.245, 26.247, 26.430 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_SDE | IMS-based Streaming and Download Delivery Enhancements | ---|------------ | Rel-12 | S4 | SP-120767 | history | 2012-12-10 | Provide an extension of IMS based PSS and MBMS user services | 2012-11-12 | - | |||||
|
- | ...TR on IMS-based Streaming and Download Delivery Enhancements | =--|--------- | Rel-12 | S4 | SP-120767 | history | 2013-02-16 | Identify use cases and requirements based on Rel-10/11 PSS and MBMS functionality to be addressed for IMS-based streaming and download enhancements. Document the adopted use cases | 2012-11-12 | new TR 26.827 | ||||
|
- | ...Specification on IMS-based Streaming and Download Delivery Enhancements specification | ---|------------ | Rel-12 | S4 | SP-120767 | history | 2012-12-10 | Develop procedures towards enabling the IMS-based extensions of the identified use cases in TS 26.237. Refine existing MBMS download procedures to enable IMS-based MBMS file repair with the use of conventional HTTP web servers. | 2012-11-12 | 26.237 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| ART_LTE | Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE | ==-|--------------- | Rel-12 | S4 | SP-120769 | history | 2012-12-10 | Triggered by Rel-12 Feature Codec for Enhanced Voice Services (EVS_codec) UID_470030. Need for super wideband acoustic requirements and test methods | 2012-11-12 | Stage 3 | |||||
|
ART_LTE-NBWB | ...Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - NarrowBand and WideBand aspects | ==-|--- | Rel-12 | S4 | SP-120771 | history | 2013-02-16 | - | 2012-11-12 | 26.131, 26.132 | ||||
|
ART_LTE-UED | ...Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - UE Delay aspects | =--|--------- | Rel-12 | S4 | SP-120770 | history | 2013-02-16 | - | 2012-11-12 | 26.131, 26.132 | ||||
|
ART_LTE-SUPER | ...Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - Super wideband and fullband aspects | =--|--------------- | Rel-12 | S4 | SP-120772 | history | 2013-02-16 | - | 2012-11-12 | 26.131, 26.132 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| MI | MBMS Improvements | |--------------- | Rel-12 | S4 | SP-130024 | history | 2013-02-20 | Stage 3 | 2013-02-20 | ||||||
|
MI-EMO | ...Enhanced MBMS Operation | |--------------- | Rel-12 | S4 | SP-130025 | history | 2013-02-20 | Stage 3 based on existing Stage 2 in TS 23.246 (Multimedia Broadcast/Multicast Service (MBMS); Architecture and functional description) | 2013-02-20 | 26.346, New TR 26.848 | ||||
|
MI-MooD | ...MBMS operation on Demand | |--------------- | Rel-12 | S4 | SP-130026 | history | 2013-02-20 | Stage 3 based on existing Stage 2 in TS 23.246 (Multimedia Broadcast/Multicast Service (MBMS); Architecture and functional description) | 2013-02-20 | 26.346, New TR 26.849 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| E2EMTSI | End-to-End Multimedia Telephony Service for IMS (MTSI) extensions | |--------- | Rel-12 | S4 | SP-130160 | history | 2013-02-20 | Linked to SA4 Rel-7 Media handling and interaction in MTSI (MTSI-MHI) UID_7040. Coordination with CT1,CT3,CT4 | 2013-02-20 | 26.114 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| OAM12 | Rel-12 Operations, Administration, Maintenance and Provisioning (OAM&P) | ======------------|------------------ | Rel-12 | S5 | not applicable | history | 2012-04-18 | OAM12 is an umbrella Feature also for OAM&P related TEI12 type of changes that are not part of any other dedicated feature/WI | 2012-04-18 | - | |||||
|
OAM12-SON | ...Rel-12 Self-Organizing Networks (SON) - OAM aspects | ========-|--------------- | Rel-12 | S5 | not applicable | history | 2012-11-19 | OAM12-SON is an umbrella BB also for SON related TEI12 type of changes that are not part of any other dedicated feature/WI | 2012-04-18 | - | ||||
|
OAM-NGMN_OPE | ...Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations | ===------|------ | Rel-12 | S5 | SP-120349 | history | 2013-01-21 | Stage 1/2/3. Source of external requirements: NGMN Top OPE Recommendations 1.0 | 2012-05-14 | 32.101/2/3,32.111-1,32.111-2,32.111-6,32.15x,32.401,32.411,32.412,32.421,32.422,32.423,32.431,32.432,32.436,32.441,32.442,32.446,32.500,32.501,32.502,32.506,32.521,32.522,32.526,32.531,32.532,32.536,32.551,32.691,32.692,32.696,32.762,New TR 32.838 | ||||
|
OAM-NGMN_NGCOR | ...Compliance of 3GPP SA5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR) | =====----|------------------ | Rel-12 | S5 | SP-120350 | history | 2013-02-16 | Stage 1/2/3. Source of external requirements: NGMN NGCOR v1.3 | 2012-05-14 | - | ||||
|
WLAN-OAM | ...WLAN Management | =--------|--------------- | Rel-12 | S5 | SP-130042 | history | 2013-03-04 | SP#59 WID updated WID SP-120354=>SP-130042 | 2012-06-12 | - | ||||
|
OAM12-NIM | ...Rel-12 Network Infrastructure Management | ========----------|--------------- | Rel-12 | S5 | not applicable | history | 2012-11-19 | - | 2012-11-15 | - | ||||
|
OAM12-PM | ...Rel-12 Performance Management | ------------------|--------------- | Rel-12 | S5 | not applicable | history | 2012-11-19 | - | 2012-11-15 | - | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| CH12 | Rel-12 Charging Management small Enhancements | ==-|------------ | Rel-12 | S5 | not applicable | history | 2012-09-19 | CH12 is an umbrella Feature also for OAM&P related TEI12 type of changes that are not part of any other dedicated feature/WI | 2012-09-19 | - | |||||
|
SMS-SC-CH | ...Short Message Service - Service Center (SMS-SC) Offline Charging | ==-|------------ | Rel-12 | S5 | SP-120775 | history | 2013-02-16 | Stage 2/3. Rel-11 Stage 1 for SIMTC 22.368 UID_480130 | 2012-11-20 | 32.240, 32.250, 32.251, 32.274, 32.298, 32.299 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| EMC_PC | IMS Emergency PSAP Callback (Stage 3) | ====--------------|--- | Rel-12 | C1;C3;IETF | CP-110725 | history | 2013-03-13 | CP#59 moved to Rel-12. Stage 3 (Dependency IETF ECRIT on PSAP call back). Fulfil SA1/2 Rel-7 EMC1 reqs UID_32045 PS domain and IMS impacts for supporting IMS Emergency calls (related to BB UID_1653 Emergency Call Enhancements for IP& PS Based Calls | 2011-08-27 | Stage 3 | |||||
|
- | ...CT1 part of IMS Emergency PSAP Callback | =-----------------|--- | Rel-12 | C1 | CP-110725 | history | 2013-03-13 | CP#59 moved to Rel-12 | 2011-08-27 | 24.229 | ||||
|
- | ...(IETF) IMS Emergency PSAP Callback (Stage 3) | ==========--------|--- | Rel-12 | C1-IETF | CP-110725 | history | 2013-03-13 | Draft not referred by 3GPP yet | 2011-08-28 | draft-ietf-ecrit-psap-callback | ||||
|
- | ...CT3 part of IMS Emergency PSAP Callback | ------------------|--- | Rel-12 | C3 | CP-110725 | history | 2013-03-13 | CP#59 moved to Rel-12 | 2011-08-27 | 29.163, 29.165 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SAES_WLAN_EPC_intwk | Interworking between a PLMN with WLAN to access the EPC and a PDN (Stage 3) | ======|======--- | Rel-12 | C3 | CP-120540 | history | 2013-02-18 | Linked to Rel-8 Feature SAES: System Architecture Evolution specification - Evolved Packet System (non RAN aspects) UID_320005, Rel-11 Feature S2a Mobility based On GTP and WLAN access to EPC (SaMOG_WLAN) UID_530046 | 2012-08-13 | 29.061 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| REP_WMD | Reporting Enhancements in Warning Message Delivery | ===|===------------ | Rel-12 | C1;C4;R3 | CP-120701 | history | 2012-11-20 | Stage 1 for Cell Broadcast does not exist. This WID enhances the reporting capabilities of Warning Message Delivery. Introduce LTE functionality requested by regulators, equivalent to existing 2G/3G functionality. | 2012-11-19 | Stage 2/3 | |||||
|
- | ...CT1 part of Reporting Enhancements in Warning Message Delivery (Stage 2) | ===|====----------- | Rel-12 | C1 | CP-120701 | history | 2013-02-18 | CP#59 completion 03/13=>06/14 | 2012-11-19 | 23.041 | ||||
|
- | ...CT4 part of Reporting Enhancements in Warning Message Delivery (Stage 3) | ===|====----------- | Rel-12 | C4 | CP-120701 | history | 2013-02-18 | CP#59 completion 03/13=>06/14 | 2012-11-19 | 29.168 | ||||
|
REP_WMD-RFR_PWS | ...Public Warning System - Reset/Failure/Restart in Warning Message Delivery in LTE | |--------- | Rel-12 | R3 | RP-130398 | history | 2013-03-01 | - | 2013-02-26 | LTE | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| bSRVCC | SRVCC before ringing | ===|=-- | Rel-12 | C1 | CP-120707 | history | 2013-02-20 | CP#59 completion 03/13=>06/13. Stage 3. Linked to Rel-8 Feature IMS Service Continuity (IMS-Cont) UID_390056. TS 23.237 Rel-12 CR#0444 under TEI12 | 2012-11-19 | 24.008, 24.237 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMSProtoc6 | IMS Stage 3 IETF Protocol Alignment - Phase 6 | ==-|--------------- | Rel-12 | C1;C3 | CP-120905 | history | 2012-12-06 | - | 2012-11-19 | Stage 3 | |||||
|
- | ...CT1 part of IMS Stage 3 IETF Protocol Alignment - phase 6 | ==-|--------------- | Rel-12 | C1 | CP-120905 | history | 2013-02-16 | - | 2012-11-19 | 23.218, 24.229, 24.930 | ||||
|
- | ...CT3 part of IMS Stage 3 IETF Protocol Alignment - phase 6 | | | Rel-12 | C3 | CP-120905 | history | 2012-12-06 | - | 2012-11-19 | 29.163, 29.165 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| SAES3 | SAE Protocol Development - Phase 3 | ==-|--------------- | Rel-12 | C1 | CP-120704 | history | 2013-02-16 | Stage 3 continuation of Rel-8 Feature SAES (3GPP System Architecture Evolution Specification - Evolved Packet System) UID_320005 | 2012-11-19 | Stage 2/3 | |||||
|
- | ...SAE Protocol Development (Stage 3) - Phase 3 | ==-|--------------- | Rel-12 | C1 | CP-120704 | history | 2013-02-16 | - | 2012-11-20 | 23.122, 24.008, 24.167, 24.229, 24.301, 24.302, 24.303, 24.304, 24.305, 24.312, 29.018, 29.118 | ||||
|
SAES3-CSFB | ...CS Fallback in EPS - Phase 3 | ==-|--------------- | Rel-12 | C1 | CP-120704 | history | 2013-02-16 | - | 2012-11-20 | 23.122, 24.008, 24.167, 24.229, 24.301, 24.302, 24.303, 24.304, 24.305, 24.312, 29.018, 29.118 | ||||
|
SAES3-non3GPP | ...SAE for support for non-3GPP accesses - Phase 3 | ==-|--------------- | Rel-12 | C1 | CP-120704 | history | 2013-02-16 | - | 2012-11-20 | 23.122, 24.008, 24.167, 24.229, 24.301, 24.302, 24.303, 24.304, 24.305, 24.312, 29.018, 29.118 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_SSFDD | IM-SSF Application Server Service Data Descriptions (Stage 2/3) | ===|==- | Rel-12 | C4;C1 | CP-120756 | history | 2012-11-20 | CP#59 Stage 2 completed. Linked to Rel-8 Feature IMS Application Server Service Data Descriptions for AS interoperability (IMS_ASIO) UID_410003. Add new services to be described for AS Interoperability | 2012-11-19 | Stage 2/3 | |||||
|
- | ...Stage 2 for IM-SSF Application Server Service Data Descriptions | ===| | Rel-12 | C1[98%] | CP-120756 | history | 2013-02-16 | CP#59 completed | 2012-11-19 | 23.218 | ||||
|
- | ...Stage 3 for IM-SSF Application Server Service Data Descriptions | ===|=-- | Rel-12 | C4 | CP-120756 | history | 2013-02-18 | - | 2012-11-19 | 29.328, 29.329, 29.364 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| Dia_SGSN_SMS | Diameter based interface between SGSN and SMS central functions (Stage 2/3) | =--|------ | Rel-12 | C4;C1 | CP-130035 | history | 2013-02-28 | Stage 2/3. CP#59 updated WID CP-130035=>CP-130035 (added CT1 Stage 2) | 2012-11-20 | - | |||||
|
- | ...Stage 2 for Diameter based interface between SGSN and SMS central functions | |------ | Rel-12 | C1 | CP-130035 | history | 2013-02-28 | CP#59 added CT1 Stage 2 options of deploying Diameter based interfaces between SGSN and central SMS functions, in addition to existing MAP based Gd interfaces | 2013-02-16 | 23.040 | ||||
|
- | ...Stage 3 for Diameter based interface between SGSN and SMS central functions | =--|------ | Rel-12 | C4 | CP-130035 | history | 2013-02-28 | - | 2012-11-20 | 29.002, 29.230, 29.272, 29.305, 29.336, 29.337, 29.338 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| Dia_SGSN_GMLC | Diameter based interface between SGSN-GMLC (Stage 3) | ===|=----- | Rel-12 | C4 | CP-120909 | history | 2013-02-18 | No Stage 2 impact. Define a Diameter variant for the protocol used over existing reference points between SGSN and GMLC for LCS (replace the use of MAP by Diameter protocol) | 2012-11-20 | 29.002, 29.172, 29.173, 29.272 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| IMS_UApAs | IMS impacts on UICC Application Aspects | |------------ | Rel-12 | C6 | CP-130169 | history | 2013-02-28 | Stage 3. Linked to Rel-11 CT1 WI ATURI (AT commands for Universal Resource Identifier support) | 2013-02-20 | 31.102, 31.103, 31.111, 31.130 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| eMBMS_Rest | eMBMS restoration procedures | |--- | Rel-12 | C4 | CP-130036 | history | 2013-02-28 | Linked to Rel-9 MBMS support in EPS (MBMS_EPS) UID_400039. Rel-10 CT Features EPC Node Restoration with/out Idle mode Signalling Reduction (ISR) activated (EPC_NR/EPC_NR_ISR) UID_510008/510108 | 2013-03-07 | 23.007 | |||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| eDRVCC | Dual Radio VCC enhancements (Stage 2/3) | ======|------ | Rel-12 | S2;C1;C3 | CP-130091 | history | 2013-02-28 | Stage 2 in Rel-12 TEI12 TS 23.237 CR#0431, CR#0440, CR#0441, CR#0453 (pre-alerting). This is Stage 3 linked to Rel-8 Feature IMS Service Continuity (IMS-Cont) UID_390056 (Stage 2 in TS 23.237) | 2013-02-16 | Stage 2/3 | |||||
|
TEI12 | ...Stage 2 for Dual Radio VCC enhancements | ======| | Rel-12 | S2 | CP-130091 | history | 2013-02-28 | Stage 2 in Rel-12 TEI12 TS 23.237 CR#0431, CR#0440, CR#0441, CR#0453 (pre-alerting) | 2013-02-16 | 23.237 | ||||
|
- | ...Stage 3 for Dual Radio VCC enhancements | |==---- | Rel-12 | C1;C3 | CP-130091 | history | 2013-02-28 | - | 2013-02-19 | Stage 3 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| RT_ERGSM | Introduction of ER-GSM band for GSM-R | ========----------|-- | Rel-12 | G1;C1 | GP-111468 | history | 2012-11-23 | Use of band 870-876/915-921 MHz for land mobile service on national possibilities/market demand - as per ECC/DEC/(04)06 | 2011-09-06 | GERAN | |||||
|
- | ...GERAN1 part of Introduction of ER-GSM band for GSM-R | ==============----|-- | Rel-12 | G1 | GP-111468 | history | 2013-03-04 | GP#51 approved WID. Introduction of ERGSM band, Performance requirements and Deployment scenarios | 2011-09-06 | 45.001, 45.005, 45.050 | ||||
|
- | ...CT1 part of Introduction of ER-GSM band for GSM-R | --------------- | | Rel-12 | C1 | GP-111468 | history | 2012-11-23 | ERGSM capability indication | 2011-09-06 | 24.008 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| DMCG | Downlink Multi Carrier GERAN | ==----|----------- | Rel-12 | G2;G1;C1;G3new | GP-121158 | history | 2012-09-03 | GP#55 approved WIDs. Linked to Rel-7 Downlink Dual Carrier UID_50579 (Previous work on multiple carriers on the downlink was limited to two). Ref: TR 45.912 Feasibility study for evolved GERAN, TS 43.064 GPRS Stage 2 | 2012-09-03 | GERAN | |||||
|
- | ...Core part: Downlink Multi Carrier GERAN | ====--|-------- | Rel-12 | G2;G1 | GP-121158 | history | 2013-03-04 | GP#57 completion 08/13=>11/13 | 2012-09-03 | 43.064, 44.018, 44.060, 45.002, 45.005, 45.008 | ||||
|
- | ...CT part: Downlink Multi Carrier GERAN | ------|----- | Rel-12 | C1 | GP-121158 | history | 2012-09-03 | - | 2012-09-03 | 24.008 | ||||
|
DMCG-MStest | ...Test part: Downlink Multi Carrier GERAN | ------|----------- | Rel-12 | G3new | GP-120930 | history | 2012-09-03 | GP#55 approved WID | 2012-09-03 | 51.010-1, 51.010-2 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| MSRD_VAMOS | Mobile Station Receive Diversity (MSRD) for Voice Services over Adaptive Multiuser channels on One Slot (VAMOS) | |----------- | Rel-12 | G1;G2;C1;G3new | GP-130285 | history | 2013-03-04 | Linked to Rel-7 Mobile Station Receive Diversity (DARP Phase II) UID_50569, Rel-9 Voice Services over Adaptive Multiuser channels on One Slot (VAMOS) UID_420002 | 2013-03-04 | GERAN | |||||
|
- | ...CT1 introduction of MS capability support for MS supporting MSRD for VAMOS | |-------- | Rel-12 | C1 | GP-130286 | history | 2013-03-04 | - | 2013-03-04 | 24.008 | ||||
|
MSRD_VAMOS-PerfReq | ...MSRD for VAMOS - Performance Requirements | |-------- | Rel-12 | G1;G2 | GP-130286 | history | 2013-03-04 | - | 2013-03-04 | 45.001, 45.005 | ||||
|
MSRD_VAMOS-Test | ...MSRD for VAMOS - MS Conformance Test | |----------- | Rel-12 | G3new | GP-130289 | history | 2013-03-04 | - | 2013-03-04 | 51.010-1, 51.010-2 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| HSPA_LTE_measRP_MIMO | Verification of radiated multi-antenna reception performance of UEs in LTE/UMTS | =======-----|--- | Rel-12 | R4 | RP-120368 | history | 2013-03-14 | RP#59 moved to Rel-12. Triggered by FS_HSPA_LTE_measRP_MIMO_multi-antenna. Core functionality exists since Rel-6 & Rel-7 (MIMO). Adds a very generic test method to test UEs with 2 or more Rx antennas | 2012-02-23 | UTRA, LTE | |||||
|
HSPA_LTE_measRP_MIMO-Perf | ...Perf. part: Verification of radiated multi-antenna reception performance of UEs in LTE/UMTS | =======-----|--- | Rel-12 | R4 | RP-120368 | history | 2013-03-14 | RP#59 moved to Rel-12. TR 37.977 v100 for Information. Rx diversity (defined as Rel-6 HSDPA RAN4 enhanced type 1 req.) & MIMO (defined as Rel-7 HSDPA MIMO for HSPA). Rx diversity & MIMO (defined as part of Rel-8 basic LTE WI) | 2012-02-23 | new TR 37.977 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| EHNB_enh3 | Further enhancements to H(e)NB mobility - Part 3 (Stage 2/3) | ==----|--- | Rel-12 | R3;R2 | RP-121444 | history | 2012-09-03 | Triggered by FS_EHNB_enh (TR 37.803) | 2012-09-03 | UTRA, LTE | |||||
|
EHNB_enh3-Core | ...Core part: Further enhancements to H(e)NB mobility - Part 3 | ==----|--- | Rel-12 | R3;R2 | RP-121444 | history | 2013-02-27 | - | 2012-09-04 | 25.331, 25.413, 25.423, 25.467, 25.469, 25.471, 36.300, 36.331, 36.413, 36.423 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_UTRA_TRP_TRS | LTE UE Total Radiated Power (TRP) and Total Radiated Sensitivity (TRS) and UTRA Hand Phantom related UE TRP and TRS Requirements | |=-------------- | Rel-12 | R4 | RP-130217 | history | 2012-12-10 | Triggered by Rel-11 TR 37.902 Study on Measurements of radio performances for LTE terminals - TRP and TRS test methodology (FS_LTE_OTA) UID_550022 | 2012-12-10 | UTRA, LTE | |||||
|
LTE_UTRA_TRP_TRS-Core | ...Core part: LTE UE TRP and TRS and UTRA Hand Phantom related UE TRP and TRS Requirements | |=-------------- | Rel-12 | R4 | RP-130217 | history | 2012-12-10 | RP#59 updated WID RP-122030=>RP-130217 (added New TS 37.1xy, new TR 37.8xy) | 2012-12-10 | 25.144, New TS 37.1xy, new TR 37.8xy | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LCS_BDS | Support for BeiDou Navigation Satellite System (BDS) for UTRA and LTE | |--------------- | Rel-12 | R2;R3;R4 | RP-130416 | history | 2013-03-05 | BeiDou = Chinese Navigation Satellite System. Location Services (LCS) TS 22.071 Stage 1, TS 23.271 Stage 2 | 2013-02-26 | UTRA, LTE | |||||
|
LCS_BDS-UTRA_Core | ...Core part: Support for BeiDou Navigation Satellite System (BDS) for UTRA | |------------ | Rel-12 | R2;R3 | RP-130416 | history | 2013-03-05 | - | 2013-02-26 | 25.305, 25.306, 25.331, 25.453, 25.413, 25.423, 25.433 | ||||
|
LCS_BDS-UTRA_Perf | ...Perf. part: Support for BeiDou Navigation Satellite System (BDS) for UTRA | |--------------- | Rel-12 | R4 | RP-130416 | history | 2013-03-05 | - | 2013-02-26 | 25.172 (FDD), new TS 25.xyz (TDD) | ||||
|
LCS_BDS-LTE_Core | ...Core part: Support for BeiDou Navigation Satellite System (BDS) for LTE | |------------ | Rel-12 | R2 | RP-130416 | history | 2013-03-05 | - | 2013-02-26 | 36.305, 36.355 | ||||
|
LCS_BDS-LTE_Perf | ...Perf. part: Support for BeiDou Navigation Satellite System (BDS) for LTE | |--------------- | Rel-12 | R4 | RP-130416 | history | 2013-03-05 | - | 2013-02-26 | 36.171 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| AAS_BS_LTE_UTRA | Base Station (BS) RF requirements for Active Antenna System (AAS) | |--------------------- | Rel-12 | R4 | RP-130373 | history | 2013-02-26 | Triggered by FS_AAS_BS_LTE_UTRA | 2013-02-26 | UTRA, LTE, GSM/EDGE | |||||
|
AAS_BS_LTE_UTRA-Core | ...Core part: Base Station (BS) RF requirements for Active Antenna System (AAS) | |--------------- | Rel-12 | R4 | RP-130373 | history | 2013-02-26 | - | 2013-02-26 | New TS 37.1xy (AAS BS transmission and reception), New TR 37.8xy (RF background for AAS BS) | ||||
|
AAS_BS_LTE_UTRA-Perf | ...Perf. part: Base Station (BS) RF requirements for Active Antenna System (AAS) | |--------------------- | Rel-12 | R4 | RP-130373 | history | 2013-02-26 | - | 2013-02-26 | New TS 37.1xy (AAS BS conformance testing) | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_CA_HetNet_ICIC | Carrier based HetNet ICIC for LTE (on hold till 06/13) | =============-----------|--------- | Rel-12 | R3;R1;R2 | RP-121198 | history | 2012-09-04 | Stage 2/3 | 2011-03-14 | LTE | |||||
|
LTE_CA_HetNet_ICIC-Core | ...Core part: Carrier based HetNet ICIC for LTE (on hold till 06/13) | =============-----------|--------- | Rel-12 | R3;R1;R2 | RP-121198 | history | 2013-02-27 | - | 2011-03-14 | 36.300, 36.413, 36.420, 36.423 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_FDD_1670_US | LTE in the 1670-1675 MHz Band for US | ===---------|--------------- | Rel-12 | R4;R2;R3 | RP-121397 | history | 2012-12-07 | - | 2012-02-23 | LTE | |||||
|
LTE_FDD_1670_US-Core | ...Core part: LTE in the 1670-1675 MHz Band for US | ====--------|------------ | Rel-12 | R4;R2;R3 | RP-121397 | history | 2013-02-28 | RP#59 completion 09/13=>03/14 | 2012-02-23 | 25.101, 25.104, 25.113, 25.133, 25.306, 25.307, 25.331, 25.461, 25.466, 34.124, 36.101, 36.104, 36.113, 36.124, 36.133, 36.307, new TR 36.832 | ||||
|
LTE_FDD_1670_US-Perf | ...Perf. part: LTE in the 1670-1675 MHz Band for US | =-----------|--------------- | Rel-12 | R4 | RP-121397 | history | 2013-02-28 | RP#59 completion 09/13=>06/14 | 2012-02-23 | 25.133, 25.306, 25.307, 25.331, 25.461, 25.466, 34.124, 36.113, 36.124, 36.133, 36.141, 36.307 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_WCS_band | LTE in the US Wireless Communications Service (WCS) Band | ==----|------ | Rel-12 | R4;R2 | RP-121419 | history | 2012-11-28 | RP#58 RP-121701 work can start based on FCC Order (FCC-12-130) http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-12-130A1.pdf | 2012-09-03 | LTE | |||||
|
LTE_WCS_band-Core | ...Core part: LTE in the US Wireless Communications Service (WCS) Band | ===---|--- | Rel-12 | R4;R2 | RP-121419 | history | 2013-02-28 | - | 2012-09-03 | 36.101, 36.104, 36.113, 36.124, 36.133, 36.307, 36.331 | ||||
|
LTE_WCS_band-Perf | ...Perf. part: LTE in the US Wireless Communications Service (WCS) Band | ------|------ | Rel-12 | R4 | RP-121419 | history | 2013-02-28 | - | 2012-09-03 | 36.101, 36.133, 36.141 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE450_Brazil | Introduction of LTE 450 MHz band in Brazil | =-----|--- | Rel-12 | R4 | RP-121414 | history | 2012-09-07 | - | 2012-09-03 | LTE | |||||
|
LTE450_Brazil-Core | ...Core part: Introduction of LTE 450 MHz band in Brazil | ===---|--- | Rel-12 | R4 | RP-121414 | history | 2013-02-28 | - | 2012-09-03 | 36.101, 36.104, 36.113, 36.124, 36.133, 37.104, 37.113, 36.307, new TR 36.8xy | ||||
|
LTE450_Brazil-Perf | ...Perf. part: Introduction of LTE 450 MHz band in Brazil | ------|--- | Rel-12 | R4 | RP-121414 | history | 2013-02-28 | - | 2012-09-03 | 36.133, 36.141, 37.141 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_eDL_MIMO_enh | Further Downlink MIMO Enhancement for LTE Advanced | =-----|------ | Rel-12 | R1;R4 | RP-121416 | history | 2012-12-06 | Stage 3 | 2012-09-03 | LTE | |||||
|
LTE_eDL_MIMO_enh-Core | ...Core part: Further Downlink MIMO Enhancement for LTE Advanced | ==----|--- | Rel-12 | R1 | RP-121416 | history | 2013-02-27 | - | 2012-09-03 | 36.211, 36.212, 36.213, 36.331 | ||||
|
LTE_eDL_MIMO_enh-Perf | ...Perf. part: Further Downlink MIMO Enhancement for LTE Advanced | ------|------ | Rel-12 | R4 | RP-121416 | history | 2013-02-27 | - | 2012-09-03 | 36.101 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_NCT | New Carrier Type for LTE | =-----|--------------- | Rel-12 | R1;R2;R4 | RP-122028 | history | 2012-09-07 | Stage 2/3 | 2012-09-03 | LTE | |||||
|
LTE_NCT-Core | ...Core part: New Carrier Type for LTE | =-----|--------- | Rel-12 | R1;R2;R4 | RP-122028 | history | 2013-02-27 | - | 2012-09-03 | 36.101, 36.104, 36.133, 36.211, 36.212, 36.213, 36.321, 36.331 | ||||
|
LTE_NCT-Perf | ...Perf. part: New Carrier Type for LTE | ------|--------------- | Rel-12 | R4 | RP-122028 | history | 2013-02-27 | - | 2012-09-03 | 36.101, 36.104, 36.133, 36.141 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_TDD_eIMTA | Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | ---|--------------- | Rel-12 | R1;R2;R3;R4 | RP-121772 | history | 2012-12-10 | Stage 3. Triggered by Rel-11 TR 36.828 Study on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation (FS_LTE_TDD_eIMTA) UID_510039 | 2012-09-03 | LTE | |||||
|
LTE_TDD_eIMTA-Core | ...Core part: Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | =--|--------- | Rel-12 | R1;R2;R3;R4 | RP-121772 | history | 2013-02-27 | - | 2012-09-03 | 36.101, 36.104, 36.133, 36.211, 36.212, 36.213, 36.214, 36.300, 36.321, 36.331, 36.413, 36.423 | ||||
|
LTE_TDD_eIMTA-Perf | ...Perf. part: Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | ---|--------------- | Rel-12 | R4 | RP-121772 | history | 2013-02-27 | - | 2012-09-03 | 36.101, 36.104, 36.133, 36.141 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| HetNet_eMOB_LTE | Hetnet Mobility Enhancements for LTE | =--|------------ | Rel-12 | R2;R4 | RP-122007 | history | 2012-12-10 | Stage 3. Triggered by Rel-11 TR 36.839 Study on HetNet mobility enhancements for LTE (FS_HetNet_eMOB_LTE) | 2012-12-10 | LTE | |||||
|
HetNet_eMOB_LTE-Core | ...Core part: Hetnet Mobility Enhancements for LTE | =--|------------ | Rel-12 | R2;R4 | RP-122007 | history | 2013-02-27 | - | 2012-12-10 | 36.133, 36.304, 36.331 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| EHNB_enh2_X2GW | Further enhancements for HeNB mobility-X2-GW | =--|------ | Rel-12 | R3 | RP-122006 | history | 2012-12-10 | Rel-10 H(e)NB Mobility Enhancements adds signalling via horizontal RAN interfaces (Iurh, X2) to support H(e)NB to H(e)NB mobility. Rel-11 TR37.803 triggered WI UID_560014 partly completed in Rel-11; remaining work including solution definition is Rel-12 | 2012-12-10 | LTE | |||||
|
EHNB_enh2_X2GW-Core | ...Core part: Further enhancements for HeNB mobility-X2-GW | =--|------ | Rel-12 | R3 | RP-122006 | history | 2013-02-27 | - | 2012-12-10 | 36.300, 36.413, 36.423 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_UL_8Rx | 8 Rx Antennas for LTE UL | ==-|--------- | Rel-12 | R4 | RP-121709 | history | 2012-12-10 | WI has perf. part only (as change from 4Rx to 8Rx has no Core spec impact) | 2012-09-03 | LTE | |||||
|
LTE_UL_8Rx-Perf | ...Performance Requirements of 8 Rx Antennas for LTE UL | ==-|--------- | Rel-12 | R4 | RP-121709 | history | 2013-02-27 | WI has perf. part only (as change from 4Rx to 8Rx has no Core spec impact) | 2012-09-03 | 36.104, 36.141 | ||||
collapse |
UID |
code........... | title............................................................................................................................................ | time line | % done |
Release | lead Group | WID | WID history | last updated | remarks................................................................................................................................. | created date | EI | impacts | abandoned |
|
|
1999        2000        2001        2002        2003        2004        2005        2006        2007        2008        2009        2010        2011        2012        2013        2014         |
|
|
|||||||||||
|
|
JFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASOND |
|
|
|||||||||||
| LTE_CA_Rel-12 | Rel-12 LTE Carrier Aggregation | ========----------|--------------------- | Rel-12 | RP | not applicable | history | 2012-12-14 | LTE_CA_Rel-12 | 2012-12-14 | LTE | |||||
|
- | ...Rel-12 inter-band Carrier Aggregation | =======-----------|--------------- | Rel-12 | RP | not applicable | history | 2012-12-14 | LTE_CA_Rel-12 | 2012-12-14 | LTE | ||||
|
LTE_CA_B1_B7 | ......LTE Advanced inter-band Carrier Aggregation of Band 1 and Band 7 | ==========--------|------ | Rel-12 | R4 | RP-122018 | history | 2012-12-06 | - | 2011-09-15 | LTE | ||||
|
LTE_CA_B1_B7-Core | .........Core part: LTE Advanced inter-band Carrier Aggregation of Band 1 and Band 7 | ==================|=----- | Rel-12 | R4 | RP-122018 | history | 2013-02-27 | RP#59 pdated WID RP-122018=>RP-130350 (changed impacted specs) | 2011-09-15 | 36.101, 36.104, 36.133, new generic TR 36.851 | ||||
|
LTE_CA_B1_B7-Perf | .........Perf. part: LTE Advanced inter-band Carrier Aggregation of Band 1 and Band 7 | ------------------|------ | Rel-12 | R4 | RP-122018 | history | 2013-02-27 | RP#59 pdated WID RP-122018=>RP-130350 (changed impacted specs) | 2011-09-15 | 36.101, 36.104, 36.133, 36.141, 36.307 | ||||
|
LTE_CA_B3_B5_2UL | ......LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 5 with 2UL | ==----------|--- | Rel-12 | R4 | RP-120867 | history | 2012-09-04 | Stage 3. Complementary to 1UL existing Rel-11 WI LTE_CA_B3_B5 UID_530026 | 2012-02-23 | LTE | ||||
|
LTE_CA_B3_B5_2UL-Core | .........Core part: LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 5 with 2UL | ====--------|--- | Rel-12 | R4 | RP-120867 | history | 2012-09-04 | - | 2012-02-23 | 36.101, 36.104, 36.133, 36.307, new generic TR 36.85x | ||||
|
LTE_CA_B3_B5_2UL-Perf | .........Perf. part: LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 5 with 2UL | ------------|--- | Rel-12 | R4 | RP-120867 | history | 2012-09-04 | - | 2012-02-23 | 36.133, 36.141 | ||||
|
LTE_CA_B2_B4 | ......LTE Advanced inter-band Carrier Aggregation of Band 2 and Band 4 | ==-------|--- | Rel-12 | R4 | RP-130175 | history | 2012-09-07 | - | 2012-06-13 | LTE | ||||
|
LTE_CA_B2_B4-Core | .........Core part: LTE Advanced inter-band Carrier Aggregation of Band 2 and Band 4 | ====-----|--- | Rel-12 | R4 | RP-130175 | history | 2013-02-27 | RP#59 updated WID RP-121145=>RP-130175 (impacted specs) | 2012-06-13 | 36.101, 36.104, 36.133, new generic TR 36.851 | ||||
|
LTE_CA_B2_B4-Perf | .........Perf. part: LTE Advanced inter-band Carrier Aggregation of Band 2 and Band 4 | ---------|--- | Rel-12 | R4 | RP-130175 | history | 2013-02-27 | RP#59 updated WID RP-121145=>RP-130175 (impacted specs) | 2012-06-13 | 36.101, 36.104, 36.133, 36.141, 36.307 | ||||
|
LTE_CA_B23_B29 | ......LTE Advanced inter-band Carrier Aggregation of Band 23 and Band 29 | ------|--- | Rel-12 | R4 | RP-130170 | history | 2012-09-03 | Stage 3. On hold until Band 29 is introduced in 3GPP specs (Band 29 = LTE_DL_FDD700) | 2012-09-03 | LTE | ||||
|
LTE_CA_B23_B29-Core | .........Core part: LTE Advanced inter-band Carrier Aggregation of Band 23 and Band 29 | ------|--- | Rel-12 | R4 | RP-130170 | history | 2013-02-28 | RP#59 updated WID RP-121421=>RP-130170 (impacted specs) | 2012-09-03 | 36.101, 36.104, 36.133, new TR 36.851 | ||||
|
LTE_CA_B23_B29-Perf | .........Perf. part: LTE Advanced inter-band Carrier Aggregation of Band 23 and Band 29 | & |